For
connection of the Company's industrial drainage line into the PKFZ
Management's main industrial drainage lines (for subsequent disposal of
industrial waste effluents), the following conditions must also be
implemented:
a) Certain control and metering/recording devices must
be provided to the satisfaction of the PKFZ Management on
the tenant's industrial drainage line and must be made accessible
to the Engineering Department staff whenever required.
b)
In the case of any failure to achieve the PKFZ Management's standard,
the discharge into the PKFZ Management's main industrial drainage
system will be stopped immediately and the tenant shall be responsible
for any consequences.
c) Charges will be levied in line with the Tariff (by local Sewerage Council, IWK). |